Skip to main content

Town of Leland Roadway Resurfacing 2024-2025

Town of Leland Roadway Resurfacing 2024-2025

The Town of Leland is proposing to resurface several streets within the Town limits. The following streets being considered for resurfacing include Carolina Avenue, sections of Grandiflora Drive, Wyland Court, Pine Harvest Drive in Magnolia Greens, Parkmore Court, sections of Westport Drive, and Sunburst Way. The scope of the project includes milling, full depth patches as needed, asphalt overlay, new striping throughout, and new street signs.

CLD Engineering, PLLC

Engineering and Design

TBD

Construction Contractor

Project Updates

Street Pavement Condition Assessment
Thursday, September 01, 2022

The Town of Leland is currently working on the 2023 Street Pavement Condition and Pavement Marking Condition Assessment where the Town will assess the condition of pavement, examine striping, and note deficiencies in the roadway.  Town Staff will use the Assessment to prioritize streets for the next resurfacing project expected for 2024-2025 local government fiscal year. The Town will identify those streets within the Town limits that will be repaved. The scope of the project includes milling, full depth patches as needed, asphalt overlay, new striping throughout, and new street signs.

Project Documents

Pavement Condition Assessment
Pavement Condition and Pavement Markings Condition Assessment
Pavement Condition Assessment Appendix
Pavement Condition Assessment Appendix Rating of all Town Streets