Skip to main content

Town of Leland Roadway Resurfacing 2024-2025

Town of Leland Roadway Resurfacing 2024-2025

The Town of Leland is proposing to resurface several streets within the Town limits. The following streets being considered for resurfacing include Carolina Avenue, sections of Grandiflora Drive, Wyland Court, Pine Harvest Drive in Magnolia Greens, Parkmore Court, sections of Westport Drive, and Sunburst Way. The scope of the project includes milling, full depth patches as needed, asphalt overlay, new striping throughout, and new street signs.

CLD Engineering, PLLC

Engineering and Design

TBD

Construction Contractor

Project Updates

Preliminary Plan Review
Tuesday, September 10, 2024

Town Staff reviewed the preliminary design plans and provided comments back to the Engineer. Next steps are for the Engineer to make revisions and submit Final Design plans to the Town for review.

Preliminary Plans
Wednesday, August 28, 2024

The Engineer has completed the Preliminary Design plans for the proposed roads to be resurfaced.

Design
Monday, July 01, 2024

The Engineer has begun design on the proposed resurfacing project. Completion of the design plans is anticipated for Summer/Fall 2024.

Geotechnical Investigation
Friday, May 10, 2024

Geotechnical crews from ESP Associates will be out Monday, May 13, 2024 to take cores at selected locations along Maplechase Drive, Wyland Court, Carolina Ave, Grandiflora Drive, and Pine Harvest Drive. Traffic will be diverted around equipment and crews during coring operation.  Residents should expect delays and use caution when driving in the area. 

Survey Update
Tuesday, April 23, 2024

Mobile LiDAR scanning is complete. ESP Associates will be out the week of April 22, 2024 to begin the geotechnical work where they will tow a GPR cart behind a truck and will move at walking speed. Traffic will be slowed down and another truck will follow to protect the GPR cart and give better visibility. Residents should expect delays and use caution when driving in the area.

Survey
Monday, April 15, 2024

Survey crews from ESP Associates will be out on Wednesday, April 17, 2024 to conduct mobile LiDAR survey and 2D mapping services that will be used to provide survey data for the Engineer. Imaging will take one-day in the field and then a few days to process and deliver the data.

Engineer
Tuesday, April 02, 2024

The Town has brought onboard CLD Engineering, PLLC to survey, design and bid the Roadway Resurfacing project. Survey is expected to begin in April and will take several weeks to complete.

Engineering
Friday, February 09, 2024

The Town is working to bring an engineering firm on board to begin survey and design in Spring 2024.

Road Resurfacing
Monday, December 11, 2023

Town Staff identified and presented to Town Council the next round of streets to be resurfaced; streets being considered include: Carolina Avenue, sections of Grandiflora Drive, Wyland Court, Pine Harvest Drive, Parkmore Court, Westport Drive, and Sunburst Way. 

Street Pavement Condition Assessment
Tuesday, January 17, 2023

The 2023 Street Pavement Condition and Pavement Marking Condition Assessment has been completed. Town Staff will use the Assessment to prioritize streets for the next round of roadway resurfacing expected for 2024-2025 local government fiscal year.

Project Documents

Pavement Condition Assessment
Pavement Condition and Pavement Markings Condition Assessment
Pavement Condition Assessment Appendix
Pavement Condition Assessment Appendix Rating of all Town Streets