
This project includes the design and construction of Long Pine Drive. This road was a NCDOT road that was given to the Town to maintain. With ongoing development in the area, the Town will look to design and construct the section of Long Pine Drive from the newly installed roundabout at Brunswick Village Boulevard Extension to the newer section near the water tower in Brunswick Forest. This project is needed to extend the life of the road with future development in the area.